      In 1953, the first national chemical engineering design unit was established in Shenyang City, which is named as Chemical Engineering Design Unit.
      In 1954, the Chemical Engineering Design Unit was relocated to Beijing, china.
      In 1955, the Unit was renamed as Chemical Engineering Design Unit of the Chemical Industry Administration Bureau of the Ministry of Heavy Industry.
      In 1965, the Ministry of Chemical Industry adjusted survey and design institutes and renamed these institutes in sequence. So the Chemical Engineering Design Unit was named as No. 1 Design Institute of the Ministry of Chemical Industry.
      In 1970, the Oil Ministry, Coal Ministry and the Ministry of Chemical Industry were consolidated as one ministry, i.e. the Ministry of Fuel Chemical Industry. So No. 1 Design Institute was accordingly renamed as Chemical Engineering Design Institute of the Ministry of Fuel Chemical Industry.
      In 1978, the State restored the system of the Ministry of Chemical Industry, so the Chemical Engineering Design Institute reused its former name, i.e. No. 1 Design Institute of the Ministry of Chemical Industry.
      In October 1982, Zia-ul-Haq, President of Pakistan, presided over the completion ceremony of the project in which we provided assistance. He spoke highly of the project and renamed the factory as “Pakistan-China Chemical Fertilizer Plant”.
      In July 1983, the first large organic chemical project—38,000t/year Crylic Acid and Esters Project of Beijing Dongfang Chemical Plant undertaken by the Corporation after relocated to Tianjin successfully passed the commissioning.
      In September 1984, the design based EPC performance was put into trial use; enterprise-style management was adopted in this public institution; and No. 1 Design Institute was renamed as China Tianjin Chemical Engineering Corporation.
      In November 1985, the signing ceremony of the contracting agreement for Weifang Soda Plant Project between Weifang City, Shandong Province and the Corporation was held.
      In December 1989, Weifang Soda Plant performed by the Corporation was completed and put into commercial operation.
      In March 1993, the Ministry of Foreign Economics and Trade approved the Corporation to conduct foreign trade; and 23 professionals were sent to Spain to participate in the joint-design of the Ethylene Project.
      In May 1993, the quality system documents were issued; and the quality policy of “Clients’ Satisfaction is TCC’s Unique Guideline” was put forward. Additionally, the Corporation ranked the 26th among Top 100 Survey and Design Units of China selected by the Ministry of Construction.
      In 1994, the leading group of new design system was established to promote the new system. In November, the registered trademark “TCC” was approved by the State Administration of Industry and Commerce; in December, the Corporation became the first one which successfully passed the ISO9001 Quality System Certification among Top 100 Survey and Design Units of China.
      In April 1995, the Corporation undertook the first project in which we directly served our foreign project owner—Novo Nordisk Bio-enzyme Project in Tianjin; in May, the Corporation undertook the first foreign-invested project with Chiyoda—Mobil Lubricant Project in Tianjin.
      In November 1995, the CCHP Project of Shanghai Coking Plant starting from process of Texaco Pressurized Coal Slurry Gasification was successfully put into commercial operation; the contract of Gas Condensate Separating Unit Project in Thailand, first overseas EPC project, was signed.
      In March 1997, the lump-sum price procurement contract for equipment exported to Indonesia signed with Mitsubishi Heavy Industries was the first equipment export project signed with foreign investors in which the Corporation utilized its foreign trade right.
      In March 1999, Heilongjiang Construction Committee approved the merger of Heilongjiang Chemical Engineering Design and Planning Institute into the Corporation. Then the Institute was renamed as Heilongjiang Branch of China Tianchen Engineering Corporation.
      In August 2000, the Corporation ranked the 198th among Global Top 225 EPC Contractors for the year of 1999 published by Engineering News-Record (ENR); in December, the Corporation became the first one which successfully passed the ISO9001 2000 Quality System Certification among Top 100 Survey and Design Units of China.
      In March 2001, the Corporation purchased Intergraph PDS three-dimensional design system and 3D workstation.
      In August 2002, the Corporation issued the HSE management system documents.
      In September 2002, the Ester Project of Exxon Mobil Chemical in South China won the Golden Key Award of EPC Performance in survey & design and engineering consultation; the Rodia Dongfang Surfactant Project in Beijing won the Silver Key Award of EPC Performance.
      In August 2003, the Texaco Gasification Plant of CCHP Project of Shanghai Coking Plant and the Nylon-66 Salt Project in Pingdingshan City respectively won the Gold Award and Bronze Award in the 10th Excellent Engineering Design.
      In February 2005, the headquarters was relocated to Beijing; the overseas operation department was established; and the Development Strategy and Planning was also issued.
      In 2008, the Corporation obtained the Comprehensive Class A qualification certificate and was approved as a High-tech Enterprise of Tianjin. Then it’s renamed as China Tianchen Engineering Corporation.
      In February 2009, the foundation of Tianchen Science Park was laid; and the New-type Gasifier Project of 200,000t/year Acetic Acid and 1000t/day Coal of Yancon Cathay Coal Chemicals Co., Ltd was hailed as one of “Top 100 Excellent Projects for the 60th Anniversary of founding of PRC”.
      In October 2011, the Corporation was relocated to Tianchen Building, and the lump sum price of the contracts signed in this year reached RMB 14.5 billion.
      In 2012, the Corporation was first listed in Global Top 150 Design Companies and ranked the 126th.

       

       



      China Tianchen Engineering Corporation (TCC)     

      津ICP备05009009号

          

      津公网安备 12011302120166号

       
      Title
      XMLURL
      URL
      Type
      Description
      Content
      Sources
      LOADING...
      MESSAGE
      Sorry, the following errors are contained in the information you submitted:
      ...
      5This prompt dialog box will be closed 5s later.Redirect to.
      Sorry, the following errors are contained in the information you submitted:
      ...
      Sorry, the following errors are contained in the information you submitted:
       
      ...